Comprehensive Full-Process Sludge Treatment Equipment:
State-of-the-Art Thickening Systems (Choose from Belt-type, Rotary Drum, or Screw Press Thickeners)
Advanced Dewatering Systems (Featuring High-Pressure Belt Deep Dewatering Machines and Screw Press Dewaterers)
Innovative Drying Systems (Featuring Intelligent Batch Dryers for Optimized Performance)
Sophisticated Integrated Auxiliary Equipment (Including Screw Conveyors, Intelligent Dosing Systems, and More)
Comprehensive End-to-End Solutions
We offer unparalleled 'Turnkey Project' services, encompassing every phase from process design, equipment customization, to installation, commissioning, and operational training. With over 500 successful projects delivered, our landmark cases include:
Municipal wastewater treatment plants with daily processing capacities exceeding 10,000 tons. Pioneering sludge reduction projects for multinational chemical enterprises.
Distinguished Main Features
1) Integrated rotary drum thickening and dewatering treatment process for seamless efficiency.
2) Versatile applications that cover a wide array of normal uses.
3) Simplified installation thanks to a compact structure and standard sizes.
4) Experience automatic, continuous operations that are simple, stable, and safe.
5) Environmentally conscious operation with low energy consumption and noise levels.
6) Effortless maintenance ensures prolonged operational longevity.
7) Pneumatic adjustable tension achieves optimal compliance with treatment effects.
Comprehensive Specification & Technical Data
1. Sludge is pumped into the mixing reaction tank, where it is thoroughly stirred and blended with the polymer solution from the polymer dosing system.
2. The sludge rapidly flocculates into larger particles, forming large-group flocs with a network structure, then flows into the gravity pre-dehydration thickener.
3. Most free water is efficiently released through the filter cloth of the gravity thickener. The effluent is collected by the filtrate tray and is pre-separated from the solid sludge.
4. Pre-dewatered sludge slides onto the upper filter belt, moving to the lower filter belt where additional pressure and shear force further dewater the sludge cake.

Founded in 2007, Shanghai Fuchan Machinery Technology Co., Ltd. is strategically positioned in Shanghai's Pudong New Area, near the Shanghai Free Trade Zone. As a technology-driven enterprise, we excel in blending science, trade, and mechanical processing. Since inception, our focus has been on R&D, production, and sales of environmental protection equipment, alongside technological advancement, technical services, and technology transfer within the environmental protection domain. Our strong alliances with leading domestic universities have fostered an integrated system of R&D, production, sales, and service.
Throughout our growth, we have been committed to absorbing cutting-edge foreign technologies, placing strong emphasis on innovation and service excellence. Guided by technology, grounded in R&D, and driven by service, we deliver comprehensive equipment solutions characterized by superior processing techniques, reliable product quality, and exemplary after-sales service.
Q: Are you trading company or manufacture?
A: We are both manufacture and trading company. We have over 10 years' professional experience as a waste water treatment equipment manufacturer and engineering service enterprise.
Q: Where is your factory located?
A: Haian City, Jiangsu Province City, which is very close to Shanghai with only less than 3 hours' driving.
Q: What kind of payment do you accept?
A: T/T, L/C
Q: Do you provide OEM service?
A: Yes.
Q: How could we trust you and your company? This is first time transaction?
A: Our company has more than 10 years professional experience. We cooperate over 1000 customers in China and overseas. Welcome to our company and watch our plant production condition any time.
Q: What certificates do you have?
A: CE/ISO
Q: Do you offer after-sales service?
A: Yes. Engineers available.
Q: How long is your warranty?
A: One year after the arrival of the goods.
Q: What about your delivery Time?
A: Normally within 45 days against down payment.